HBH Vietnam — Vì chất lượng cuộc sống
SERVICES · 04 GROUPSM&E · HVAC · BMS

Four services.
One commitment.

From design-phase consulting to maintenance across the building's entire lifecycle.

— SERVICE PROCESS · 07 STEPS

From request to maintenance.

  1. STEP 01
    Receive request

    Capture requirements via form, hotline or email — response within 24 hours.

  2. STEP 02
    Site survey

    Engineers visit the site to measure, assess current conditions and technical requirements.

  3. STEP 03
    Quotation & proposal

    Propose solutions, break down quantities and provide a detailed, transparent quotation.

  4. STEP 04
    Contract signing

    Agree on scope, schedule and warranty terms, then sign the contract.

  5. STEP 05
    Execution

    Supply genuine equipment and install per shop drawings and the committed schedule.

  6. STEP 06
    Acceptance & handover

    Testing, commissioning and acceptance with the investor, plus operation training.

  7. STEP 07
    Warranty & maintenance

    Minimum 24-month warranty and long-term periodic maintenance contracts.

Need a quote for your project?

Request a Quote