HBH Vietnam — Vì chất lượng cuộc sống
FIELDS · 06 GROUPSM&E · HVAC · BMS

Six core disciplines.
One single partner.

From HVAC and ventilation to medical gas, ELV – BMS and power distribution switchboards for smart buildings.

— EXTENDED GROUP
Complete M&E system installation

Comprehensive M&E installation — electrical, plumbing, HVAC and fire protection — securing the general-contractor schedule.

— EXTENDED GROUP
Smart building management BMS / ACS / EMS

Building management, access control and energy monitoring — the foundation for smart buildings.

— PROCESS · 05 STEPS

From survey to handover.

01
Survey

On-site measurement and analysis of cooling, electrical and ventilation loads.

02
Design

Shop drawings and calculations that optimize both capital and operating costs.

03
Supply

Genuine equipment with full CO/CQ documentation and on-site logistics.

04
Installation

Dedicated installation teams, a committed schedule and absolute safety.

05
Handover & maintenance

Commissioning, training, a 24-month warranty and long-term maintenance.