Back to projects list
Chiller · AHU · BMSYEAR · 2020
Military Hospital 103 — Building A2
Supply & installation of 2,400 RT Chiller system, AHU, central BMS

— TECHNICAL NOTES
Scope of work
Supply & installation of 2,400 RT Chiller system, AHU, central BMS. HBH acts as the M&E main contractor for the entire system, including site survey, shop drawing design, supply of genuine equipment, installation and operational handover on the main-contract schedule.
The system carries a 24-month warranty per manufacturer standards, with a periodic maintenance contract signed with HBH's dedicated engineering team.