HBH Vietnam — Vì chất lượng cuộc sống
Back to projects list
Cấp thoát nước · Chiếu sáng · Nước nóng trung tâmYEAR · 2022

Building K2 — Technical Systems (Package 29)

Supply and installation of indoor lighting, plumbing, RO sterile water, hot water, airfield lighting and flight operations equipment

Building K2 — Technical Systems (Package 29)

Total value: 10.500.000.000 VNĐ