Back to projects list
BMS · Giám sát môi trường · Kiểm soát vào raYEAR · 2019
Building N6 — Hoang Hoa Tham Main Station (Package 115-DTRR/VTNET/2019)
Supply and installation of BMS plus ACS, EMS and water leak monitoring systems

— TECHNICAL NOTES
Scope of work
Supply and installation of BMS plus ACS, EMS and water leak monitoring systems. HBH acts as the M&E main contractor for the entire system, including site survey, shop drawing design, supply of genuine equipment, installation and operational handover on the main-contract schedule.
The system carries a 24-month warranty per manufacturer standards, with a periodic maintenance contract signed with HBH's dedicated engineering team.



